Open stage doors, vacuum the stage, remove any lunch tables and store them outside of building but not blocking the doors or side walk.
Put away all cleaning quipment (out of sight); remove all large garbage cans from the gym and stage, set up the risers on the stage facing the gym;
set up all five risers and connect them(on stage) and 300 chairs(ON GYM FLOOR)
clean gym floor. set up the chairs so they are facing the stage, make an exit aisle down the middle.